[1]
Sartono et al. 2025. Optimalisasi Lead Time Pengadaan Spare Parts Melalui Penerapan Value Stream Mapping (VSM) dan Material Requirement Planning (MRP) di PT XYZ. Jurnal Ilmiah Teknik Mesin, Elektro dan Komputer. 5, 2 (Jul. 2025), 345–352. DOI:https://doi.org/10.51903/juritek.v5i2.4950.