[1]
Marnida Aryani et al. 2025. Analysis and Handling of STA 1+325 SD 1+475 Embankments in the Construction of the IKN Toll Road, Balang Island Bridge Segment – Sp. Riko. Journal of Engineering, Electrical and Informatics. 5, 3 (Oct. 2025), 01–09. DOI:https://doi.org/10.55606/jeei.v5i3.5361.